Lessons Learned from 27 Years' Experience of Stimulation Vessel Design and Operation - a Case Study

Abstract: The operating envelope and environmental demands for hydraulic fracturing and stimulation treatments in the North Sea are increasingly larger and more complex. As a result, a generation of vessels designed and built in the 1980s are increasingly unable to achieve operational, economic and/or environmental goals. Thus, a new generation of vessels must be designed specifically to meet these European requirements.The design characteristics of a new vessel can be split into five categories: (i) stimulation plant (… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2015
2015
2016
2016

Publication Types

Select...
2

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 8 publications
0
2
0
Order By: Relevance
“…The design and fabrication of the stimulation vessel used in this operation has been previously described in detail (Martin et al 2013). The three North Sea stimulation vessels that were originally launched in the early 1980s were the biggest and best in the industry at the time.…”
Section: Stimulation Vesselmentioning
confidence: 99%
“…The design and fabrication of the stimulation vessel used in this operation has been previously described in detail (Martin et al 2013). The three North Sea stimulation vessels that were originally launched in the early 1980s were the biggest and best in the industry at the time.…”
Section: Stimulation Vesselmentioning
confidence: 99%
“…The lack of offshore pilots is probably not mainly because the offshore reservoirs differ from the onshore ones, but rather than the offshore logistics are more complex and storing capacity and available free space for mixing and pumping are more challenging. As reported by Martin et al (2013), in recent years, well stimulation performed by stimulation vessels of typical size around 3,000 DWT is routine work. Using a similar approach, but upscaled by one order of magnitude, may widen the range of use to also include vessels in offshore EOR operations.…”
Section: Introductionmentioning
confidence: 96%