2008
DOI: 10.1016/j.nimb.2008.05.141
|View full text |Cite
|
Sign up to set email alerts
|

Layout of the Super-FRS target hall

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
16
0

Year Published

2010
2010
2022
2022

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 12 publications
(16 citation statements)
references
References 9 publications
0
16
0
Order By: Relevance
“…The Low-Energy Branch (LEB) where properties of nuclei such as decay modes and energy levels can be explored using gamma and decay spectroscopy as well as trapped ions, The production of rare isotopes in the target by fragmentation of heavy nuclei is accompanied by creation of neutrons of similar high velocities as that of projectile [12,13]. In Fig.…”
Section: Super-frsmentioning
confidence: 99%
See 1 more Smart Citation
“…The Low-Energy Branch (LEB) where properties of nuclei such as decay modes and energy levels can be explored using gamma and decay spectroscopy as well as trapped ions, The production of rare isotopes in the target by fragmentation of heavy nuclei is accompanied by creation of neutrons of similar high velocities as that of projectile [12,13]. In Fig.…”
Section: Super-frsmentioning
confidence: 99%
“…The beam catchers are foreseen to absorb the primary beam at positions where its diameter is larger than at the target. In total six of these beam catchers are planned [12]. They are located in the first half of the Super-FRS pre-separator always following one of the 11° dipole magnets as it is shown in Fig.…”
Section: Super-frsmentioning
confidence: 99%
“…This means that the initially high beam rate will be reduced more and more along the beamline ( Figure 10). Consequently, the activation levels differ by orders of magnitude along the Super-FRS tunnel [49], [50]. A detailed Super-FRS layout can be seen in Figure 10 with respective maximal beam intensities.…”
Section: Beam Losses At Super-frsmentioning
confidence: 99%
“…Special considerations [4] like adding beam catchers and dividing a dipole stage into three dipole units have been taken in developing the layout shown in Figure 2. The approximate length and height of the target area are 25m and 5m, respectively.…”
Section: Super-frs Target Areamentioning
confidence: 99%
“…One is to absorb the kinetic energy of the heavy ions that does not interact with the production target. The second is to shield the following parts of the separator from high levels of secondary radiation [4]. Since energy absorption and shielding require different types of materials [3], two successive types of beam catchers, as shown in Figure 7, are foreseen.…”
Section: Target Area Vertical Plug Systemmentioning
confidence: 99%