Proceedings of the 10th Int. Particle Accelerator Conf. 2019
DOI: 10.18429/jacow-ipac2019-mopts051
|View full text |Cite
|
Sign up to set email alerts
|

Lattice Design for 5MeV-125mA CW RFQ Operation in the LIPAc

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(3 citation statements)
references
References 0 publications
0
3
0
Order By: Relevance
“…The beam tracking simulation predicts the effective beam loss in the middle of the MEL and after the bending magnet. In the last beam operation, beam losses are undetectable for the ionization chambers with the present threshold and are in saturation for the 3 He detectors due to the background neutron scattering. Thus, plastic scintillators were used for this study at the above two locations.…”
Section: Measurement Of the Beam Lossmentioning
confidence: 89%
See 2 more Smart Citations
“…The beam tracking simulation predicts the effective beam loss in the middle of the MEL and after the bending magnet. In the last beam operation, beam losses are undetectable for the ionization chambers with the present threshold and are in saturation for the 3 He detectors due to the background neutron scattering. Thus, plastic scintillators were used for this study at the above two locations.…”
Section: Measurement Of the Beam Lossmentioning
confidence: 89%
“…The LIPAc equips the ionization chamber, the 3 He detector, and the plastic scintillator along the beam line as the beam loss monitor. The beam tracking simulation predicts the effective beam loss in the middle of the MEL and after the bending magnet.…”
Section: Measurement Of the Beam Lossmentioning
confidence: 99%
See 1 more Smart Citation