2024
DOI: 10.1088/1748-0221/19/05/t05002
|View full text |Cite
|
Sign up to set email alerts
|

Measurements of momentum halo due to the reduced RFQ voltage during the LIPAc beam commissioning

K. Hirosawa,
L. Bellan,
F. Benedetti
et al.

Abstract: The Linear IFMIF Prototype Accelerator, LIPAc, is being commissioned aiming at validating the RFQ up to 5 MeV beam acceleration. Eventually, the nominal beam of 5 MeV–125 mA in 1 ms length and 1 Hz rate pulsed mode was achieved in 2019. The beam operation has been resumed since July 2023 after a long maintenance including recovery from unexpected problems in the RFQ-RF system. This new phase aims at the commissioning of the full configuration except SRF LINAC, which is replaced by a temporary … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 14 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?