Lean Construction
DOI: 10.4324/9780203345825_involvement_of_customer_requirements_in_building
|View full text |Cite
|
Sign up to set email alerts
|

Involvement of customer requirements in building design

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
5
0

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 8 publications
(5 citation statements)
references
References 0 publications
0
5
0
Order By: Relevance
“…Also in the US, Mallon and Mulligan (1993) demonstrated the applicability of the HoQ in a hypothetical renovation project. Huovila et al (1997) implemented the QFD methodology in a flat, a restaurant and an industrial building and showed that, in spite of the extra work involved, even its partial implementation could bring about benefits (e.g. better designs, better communication with customers) to companies in the sector.…”
Section: Qfd and The Hoq In Constructionmentioning
confidence: 98%
“…Also in the US, Mallon and Mulligan (1993) demonstrated the applicability of the HoQ in a hypothetical renovation project. Huovila et al (1997) implemented the QFD methodology in a flat, a restaurant and an industrial building and showed that, in spite of the extra work involved, even its partial implementation could bring about benefits (e.g. better designs, better communication with customers) to companies in the sector.…”
Section: Qfd and The Hoq In Constructionmentioning
confidence: 98%
“…Gargion (1999) reported that the application of QFD has focused on different ways, such as a hypothetical renovation of a personal computer workroom (Mallon and Muligan, 1993), integrating of the customer's requirements in an industrialized housing component (Amarcost et al, 1994), and determining the design characteristics of the internal layout of a building apartment (Serpell and Wagner, 1997), testing the applicability of QFD to construction involving companies from different backgrounds (Huovila et al, 1997). Other studies of the implementation of QFD in construction have been reported, such as to examine the awareness and applicability of QFD methodology in design/build contracts (Low and Yeap, 2001), to improve layout and features of a middle-class apartment unit (Gargione, 1999), to incorporate customer demands into the design process (Stehn and Bergström, 2002), to establish prioritized order of consumer requirements in low-cost flats (Abdul-Rhman et al, 1999), to propose a model that can be readily used in the planning and design process of capital projects (Ahmed et al, 2003).…”
Section: A Glance At Qfdmentioning
confidence: 99%
“…The literature review shows that there are several investigations that use the QFD method in the construction industry [7][8][9][10][11][12][13][14][15][16][17][18][19][20][21][22][23][24].…”
Section: Introductionmentioning
confidence: 99%