2007
DOI: 10.24084/repqj05.330
|View full text |Cite
|
Sign up to set email alerts
|

International review of grid connection requirements related with voltage dips for wind farms

Abstract: In this work, the Spanish grid code is compared to other recently approved-or proposals published or under revision-international regulations for connection of wind turbines to the network. More specifically, it highlights their main characteristics.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
3
0

Year Published

2013
2013
2022
2022

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(4 citation statements)
references
References 7 publications
0
3
0
Order By: Relevance
“…To set different values for each sequence admittance in the virtual admittance block, the unified value of resistance and inductance can be modified by different coefficients, as shown in Equation (27). In this way, the admittance value for each branch can be simply defined by specifying value for the coefficients A pos , A neg and A trans .…”
Section: Simulation Resultsmentioning
confidence: 99%
See 1 more Smart Citation
“…To set different values for each sequence admittance in the virtual admittance block, the unified value of resistance and inductance can be modified by different coefficients, as shown in Equation (27). In this way, the admittance value for each branch can be simply defined by specifying value for the coefficients A pos , A neg and A trans .…”
Section: Simulation Resultsmentioning
confidence: 99%
“…In the REE (the Spanish electrical grid operator) grid codes, it is required that the voltage support by reactive current injection should be activated once the voltage is lower than 85% of its rated value, and the reactive current should reach 90% when the voltage is lower than 50% of its rated value [27]. Based on these critical points, the proportional gain for reactive current injection, k q , is calculated to be equal to or greater than 2.57.…”
Section: Of 21mentioning
confidence: 99%
“…The basic principle is same as the voltage regulation by reactive power control: DER inverters absorb reactive power when the voltage is swelling and inject reactive power when the voltage is sagging. The reactive power support requirements such as the ratio of reactive current to voltage sag/swell, maximum required reactive power also vary from country to country [87]. Moreover, low voltage ride-through (LVRT) occurs at a wider range than high voltage ride-through (HVRT) as the disturbance tolerance for voltage swells is much smaller than that for voltage sags.…”
Section: A Voltage Ride-through Requirementsmentioning
confidence: 99%
“…In the REE (the Spanish electrical grid operator) grid codes, it is required that the voltage support by reactive current injection should be activated once the voltage is lower than 85% of its rated value, and the reactive current should reach 90% when the voltage is lower than 50% of its rated value [71]. Based on these critical points, the proportional gain for reactive current injection, kq, is calculated to be equal to or greater than 2.57.…”
Section: A Requirements Of Grid Codesmentioning
confidence: 99%