eWork and eBusiness in Architecture, Engineering and Construction 2014
DOI: 10.1201/b17396-96
|View full text |Cite
|
Sign up to set email alerts
|

Interactive client centric design management process for construction projects

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
8
0

Year Published

2017
2017
2024
2024

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(12 citation statements)
references
References 1 publication
0
8
0
Order By: Relevance
“…Two streams of research predominated in the “collaboration” cluster: developing collaboration platforms and improving collaborative behavior among stakeholders. Three of the studies (Alhava et al , 2015; Ma and Ma, 2017; Ma et al , 2018a) focused on developing the collaboration platform. In their study of knowledge exchange for collaborative performance assessment, Staykova and Underwood (2017) proposed a tool based on 20 characteristics of knowledge exchange for use in BIM-based IPD projects where collaboration is among the main goals.…”
Section: Resultsmentioning
confidence: 99%
See 1 more Smart Citation
“…Two streams of research predominated in the “collaboration” cluster: developing collaboration platforms and improving collaborative behavior among stakeholders. Three of the studies (Alhava et al , 2015; Ma and Ma, 2017; Ma et al , 2018a) focused on developing the collaboration platform. In their study of knowledge exchange for collaborative performance assessment, Staykova and Underwood (2017) proposed a tool based on 20 characteristics of knowledge exchange for use in BIM-based IPD projects where collaboration is among the main goals.…”
Section: Resultsmentioning
confidence: 99%
“…In their study of knowledge exchange for collaborative performance assessment, Staykova and Underwood (2017) proposed a tool based on 20 characteristics of knowledge exchange for use in BIM-based IPD projects where collaboration is among the main goals. One study (Alhava et al , 2015) proposed the use of an “intensive big room” to extend BIM beyond design to construction to facilitate IPD. They described this setup as a combination of BIM, integrated concurrent engineering and big room approaches (Alhava et al , 2015).…”
Section: Resultsmentioning
confidence: 99%
“…A key to this will be the integration of the DQI tool within a digital project environment such as BIM or making it interoperable with other project data and applications. This will facilitate interactivity and compliance checking between defined aspirations and project decisions and actions (Alhava et al, 2014, Kim et al, 2015. A framework for achieving this could include the following elements:…”
Section: Towards a Roppmentioning
confidence: 99%
“…Value generation in construction projects depends strongly on the identification, processing and communication of client requirements to support decision making in the design process [1]. However, there are well-known difficulties in managing client requirements in construction projects: (i) Client requirements are often poorly identified and updated [2,3]; (ii) clients' needs change over time, and new requirements often emerge throughout project stages [4][5][6][7]; (iii) little use is made of repositories of information on client requirements [7]; (iv) requirements are not widely available, and hence, not accessible to all product development team members [3,7,8]; and (v) there are difficulties in tracking requirements, due to the fact that much of the information involved is qualitative [7,9,10].…”
Section: Introductionmentioning
confidence: 99%
“…Connection: A clear connection between requirements and objects in product models, such as spaces of components, must be established [13,25,27,29,54,56,58,59,63]. Those connections could support value generation by making it easy for decision-makers to understand the required functionalities of building spaces or components [6]; 4.…”
mentioning
confidence: 99%