2011
DOI: 10.1016/j.proeng.2011.08.1007
|View full text |Cite
|
Sign up to set email alerts
|

Integration Research and Design of the Bridge Maintenance Management System*

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0
1

Year Published

2015
2015
2024
2024

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 12 publications
(5 citation statements)
references
References 4 publications
0
4
0
1
Order By: Relevance
“…According to research, information modeling leads to 5-9% cost savings during construction stages through reduced rework [205], project schedule tracking, and improved structural monitoring [206,207]. Regarding the operation and maintenance phases of infrastructure, several studies have developed management systems based on BIM and GIS integration approaches [154,[208][209][210] to improve inspection [211,212], bridge evaluation, maintenance decision-making, and structural health recovery [213][214][215][216][217]. One of the most significant challenges for integrated management with the GeoBIM approach is the data format compatibility when exchanging information back and forth in collaborative environments [46].…”
Section: Integrated Geospatial and Building Information Modeling (Geo...mentioning
confidence: 99%
“…According to research, information modeling leads to 5-9% cost savings during construction stages through reduced rework [205], project schedule tracking, and improved structural monitoring [206,207]. Regarding the operation and maintenance phases of infrastructure, several studies have developed management systems based on BIM and GIS integration approaches [154,[208][209][210] to improve inspection [211,212], bridge evaluation, maintenance decision-making, and structural health recovery [213][214][215][216][217]. One of the most significant challenges for integrated management with the GeoBIM approach is the data format compatibility when exchanging information back and forth in collaborative environments [46].…”
Section: Integrated Geospatial and Building Information Modeling (Geo...mentioning
confidence: 99%
“…Although these technologies have many benefits, there are some shortcomings, including the lack of overall perspective [41,42] and the impact of weather changes on data quality [14,34,37,38,77,78]; these can affect bridge evaluation outcomes [73]. Therefore, the existing evaluation models may not be directly applicable to other projects [48,49,52,81], given that they may negatively affect maintenance decisions of other bridges.…”
Section: Operation and Maintenancementioning
confidence: 99%
“…For the operation and maintenance stage, Table 5 shows that the bridge management personnel developed BMS [12,[14][15][16][17]36,44,45,51,52,73,77,78,[84][85][86] based on BIM/GIS technology to facilitate bridge inspection/monitoring [14,34,[37][38][39][40]43,44,[47][48][49][50][51][77][78][79][80][81], bridge evaluation [12,14,16,34,37,38,[41][42][43][44][45][48][49][50]52,…”
mentioning
confidence: 99%
“…Bridge Management System (BMS) adalah sistem komputer terintegrasi untuk memberikan dukungan keputusan selama fase desain, konstruksi, operasi, dan pemeliharaan. BMS dapat meningkatkan efisiensi manajemen dan mengurangi biaya yang berlebihan dalam menangani masalah manajemen infrastruktur [7] . Banyak BMS yang telah dikembangkan, dan hasil praktis yang cukup baik telah dicapai, seperti BMS berbasis GIS [8] , BMS berbasis data inspeksi visual [9] dan BMS berbasis consecutive condition assessment [10] .…”
Section: Tinjauan Pustakaunclassified