2014 Clemson University Power Systems Conference 2014
DOI: 10.1109/psc.2014.6808117
|View full text |Cite
|
Sign up to set email alerts
|

Integration of mechanical and electrical hardware for testing full scale wind turbine nacelles

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
19
0

Year Published

2015
2015
2024
2024

Publication Types

Select...
4
3

Relationship

1
6

Authors

Journals

citations
Cited by 17 publications
(19 citation statements)
references
References 3 publications
0
19
0
Order By: Relevance
“…The full test bench model incorporates many of the test bench's components including the drive motor and its associated control system, the shaft couplings, the reduction gearbox (including nonlinear tooth stiffness, shaft stiffness, and bearing stiffness), the low-speed shaft, and the nacelle including its main bearing, gearbox, gearbox bushings, and control systems. A detailed description of the full test bench may be found in [1]. The inputs to the multibody model of the disk are the forces and moments resulting from the hydraulic actuators, and the outputs are the displacements and velocities (linear and angular) of the disk.…”
Section: A Multibody Modeling (Simpack Plant)mentioning
confidence: 99%
See 2 more Smart Citations
“…The full test bench model incorporates many of the test bench's components including the drive motor and its associated control system, the shaft couplings, the reduction gearbox (including nonlinear tooth stiffness, shaft stiffness, and bearing stiffness), the low-speed shaft, and the nacelle including its main bearing, gearbox, gearbox bushings, and control systems. A detailed description of the full test bench may be found in [1]. The inputs to the multibody model of the disk are the forces and moments resulting from the hydraulic actuators, and the outputs are the displacements and velocities (linear and angular) of the disk.…”
Section: A Multibody Modeling (Simpack Plant)mentioning
confidence: 99%
“…C LEMSON University's Wind Turbine Drivetrain Testing Facility (WTDTF) houses two dynamometer test benches designed to test full-scale wind turbine nacelles [1]. The smaller of the two test benches is rated at 7.5-MW, while the larger one is rated at 15-MW.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…(3) It uses the computer technology promotes the degree of automation of the product reduce the operation button and handle, to improve the operating performance of the equipment. (4) Using microprocessor, large scale integrated circuit, power electronics devices that reduce the number of component parts in the mechanical and electrical integration products, volume small, the structure is simplified [1][2][3].…”
Section: Introductionmentioning
confidence: 99%
“…Alternatively, the fully assembled drive train of a WTG can be investigated in realistic conditions at Ground Testing Facilities [5]. Among others such test facilities are built by Clemson University, United States [6], Fraunhofer IWES, Germany [7] or the National Renewable Energy Centre, England [8]. Compared to field experiments the advantage of all types of Ground Testing Facilities is the reproducible and deterministic characteristic of tests, which obviously cannot be achieved in field experiments, where the WTG is exposed to volatile aerodynamic conditions.…”
Section: Introductionmentioning
confidence: 99%