IET Conference Publications 2009
DOI: 10.1049/cp.2009.0798
|View full text |Cite
|
Sign up to set email alerts
|

Integrated solution to target MV cable replacement

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
4
0

Year Published

2016
2016
2020
2020

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(4 citation statements)
references
References 0 publications
0
4
0
Order By: Relevance
“…Relations (27) and (28) specify constraints on fictitious power flows needed when DG units are connected, whilst radiality constraint is set by (29).…”
Section: B) Optimal Network Reconfigurationmentioning
confidence: 99%
See 3 more Smart Citations
“…Relations (27) and (28) specify constraints on fictitious power flows needed when DG units are connected, whilst radiality constraint is set by (29).…”
Section: B) Optimal Network Reconfigurationmentioning
confidence: 99%
“…Consideration of system aspects in replacement planning was first done for ageing transformers, which are arguably the most important components. Hence, the ageing and replacement of cables and transformers was reviewed and classified into four categories: a) Ageing processes in cable [3][4][5][6][7][8][9][10] and transformers [11][12][13][14][15][16]; b) Power system analyses with ageing components [17][18][19][20][21][22][23][24]; c) Replacement of individual/ populations of cable [2,[25][26][27] and transformers [28]- [31]; and d) Cable and transformer replacement based on power system analyses [32][33][34].…”
mentioning
confidence: 99%
See 2 more Smart Citations