2017
DOI: 10.1061/(asce)nh.1527-6996.0000253
|View full text |Cite
|
Sign up to set email alerts
|

Integrated Framework for Emergency Shelter Planning Based on Multihazard Risk Evaluation and Its Application: Case Study in China

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
8
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
8
1

Relationship

1
8

Authors

Journals

citations
Cited by 19 publications
(8 citation statements)
references
References 32 publications
0
8
0
Order By: Relevance
“…The AI computations performed in the modelling process include finding support for learning, determining which activities give the best rewards and understanding neural network algorithms. The motivation behind creating these models and teaching support learning is to enhance motivation (Fan et al , 2017). Although there are numerous applications for learning models, mechanical technology, games and route are not restricted to that list.…”
Section: Machine Learning Calculations Significant Classesmentioning
confidence: 99%
“…The AI computations performed in the modelling process include finding support for learning, determining which activities give the best rewards and understanding neural network algorithms. The motivation behind creating these models and teaching support learning is to enhance motivation (Fan et al , 2017). Although there are numerous applications for learning models, mechanical technology, games and route are not restricted to that list.…”
Section: Machine Learning Calculations Significant Classesmentioning
confidence: 99%
“…In recent years, global climate change has intensified, and natural hazards are frequent, with significant implications for regional economic development and urban safety [1,2]. China is one of the countries that suffer the most from earthquakes and floods in the world [3][4][5][6].…”
Section: Introductionmentioning
confidence: 99%
“…In recent years, major emergencies have frequently occurred in China. Temporary rescue sites, road and bridge restoration, emergency hospitals and other projects have required each builder to rapidly respond to achieve loss and damage minimization [ 1 4 ]. Due to the incident urgency, taking Huoshenshan and Leishenshan Hospitals under COVID-19-related constraints as an example [ 5 7 ], China raised the efforts of the whole society to provide a large number of resources to ensure rapid high-quality construction within an extremely short period.…”
Section: Introductionmentioning
confidence: 99%