1996
DOI: 10.1007/bf02447680
|View full text |Cite
|
Sign up to set email alerts
|

Inspection of hydraulic structures of electric power stations of the Russian power-grid joint stock company RAO “EÉS Rossii” in 1995

Abstract: In accordance with the schedule of inspecting hydrotechnical structures of electric power stations of the RAO "EI~S Rossii" in 1995, specialized commissions conducted a centralized inspection of the condition of the structures at 20 stations, including eight hydroelectric stations.The extent and procedure of the inspection were determined by the "Regulations for the System of Sector Supervision of the Safety of Hydraulic Structures of Electric Power Stations."Centralized inspections of hydraulic structures of … Show more

Help me understand this report

This publication either has no citations yet, or we are still processing them

Set email alert for when this publication receives citations?

See others like this or search for similar articles