2020
DOI: 10.1016/j.jmrt.2020.10.058
|View full text |Cite
|
Sign up to set email alerts
|

Influence of lime particle and slag properties on lime dissolution in BOF converter

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
13
0
1

Year Published

2021
2021
2024
2024

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 15 publications
(14 citation statements)
references
References 12 publications
0
13
0
1
Order By: Relevance
“…Eccentrically stirring the molten slag (containing a lime cube); [9,10] stirring slag using a Mo impeller [11] or alumina impeller; [12] argon gas bubbling in slag via an iron tube [13,14] Increased mass transfer in slag due to forced convection; realistic method(s) to simulate the actual situation in BOS converters.…”
Section: Forced Convectionmentioning
confidence: 99%
See 2 more Smart Citations
“…Eccentrically stirring the molten slag (containing a lime cube); [9,10] stirring slag using a Mo impeller [11] or alumina impeller; [12] argon gas bubbling in slag via an iron tube [13,14] Increased mass transfer in slag due to forced convection; realistic method(s) to simulate the actual situation in BOS converters.…”
Section: Forced Convectionmentioning
confidence: 99%
“…CaO-FeO-SiO 2 slag and lime cube sample. The other attempts to increase the convection include using a molybdenum impeller [11] or an alumina impeller [12] rotating at a certain speed to promote the agitation of the metal/slag bath. Maruoka et al [13,14] measured the dissolution rate under the experimental condition of argon gas bubbling through an iron tube into slag.…”
Section: Dynamic Condition-sampling From Industry Convertersmentioning
confidence: 99%
See 1 more Smart Citation
“…Dodatkom talitelja počinje i reakcija između novonastalih oksida mangana, željeza, fosfora, čime dolazi do stvaranja troske koja "pliva" na površini čelika kad se završi upuhivanje kisika. 42,43 Upuhivanje kisika provodi se pomoću vodom hlađenog koplja koje se u KK najčešće uvodi odozgo. Položaj koplja (uvjetovan radom čeličane) osigurava pravilno odvijanje procesa.…”
Section: Današnji Postupci Proizvodnje čElikaunclassified
“…Wang does many studies on the relationship between microstructure and physicochemical properties of limestone including, porosity, bulk density, pore size distribution, specific surface area and activity were studied under the condition of rapid heating from room temperature to 1350–1550 °C, the results showed that complete decomposition of limestone (diameter 12.5–15 mm) at 1350 °C, 1450 °C and 1550 °C took 11.7 min, 9.2 min and 6.9 min, respectively [ 3 ]. The subject of was to evaluate the influence of lime particle size and lime calcination level as well as slag properties (basicity, viscosity, CaO activity and density) on lime particle dissolution at temperature in the early stage of process blowing time of the basic oxygen furnace (1400 °C) [ 4 ].…”
Section: Introductionmentioning
confidence: 99%