Battery Operated Devices and Systems 2009
DOI: 10.1016/b978-0-444-53214-5.00004-2
|View full text |Cite
|
Sign up to set email alerts
|

Industrial Applications (Except Road Vehicles)

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2017
2017
2024
2024

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 16 publications
0
1
0
Order By: Relevance
“…To get a precision position, we usually measured when there is a minimum of 4 satellites was locked by the echo-sounder. The three satellites to determine the position, and one to adjust the error in the receiver's clock [2] . The speed of boat was range from 2-3 knots.…”
Section: Experimental Design Materials and Methodsmentioning
confidence: 99%
“…To get a precision position, we usually measured when there is a minimum of 4 satellites was locked by the echo-sounder. The three satellites to determine the position, and one to adjust the error in the receiver's clock [2] . The speed of boat was range from 2-3 knots.…”
Section: Experimental Design Materials and Methodsmentioning
confidence: 99%