Implementation of Integrated Project Delivery in Lebanon: Overcoming the Challenges

Abstract: Integrated Project Delivery (IPD) approach is important to deliver value and reduce waste by integrating the stockholders early in a project. Despite its numerous advantages over the traditional delivery systems, IPD's applicability in the Middle East has not yet reached its potential. In Lebanon, the construction market is dominated by delivery practices such as design-bid-build or design-build. The aim of this paper is to examine the Lebanese construction industry experiences in project delivery methods and … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
5
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 12 publications
(9 citation statements)
references
References 6 publications
0
5
0
Order By: Relevance
“…Furthermore, a need for more integration in delivering construction projects is critical to cover the limitations of the traditional DBB method, which leads to the development of various cultures that results in severe inefficiency and high costs of inadequate interoperability as well as high levels of data and team fragmentation that even CM and CMR methods were not able to overcome [28][29][30][31]. Indeed, these traditional delivery approaches have historically resulted in a profound number of claims, high risks, delayed schedules and over-priced projects [32]. It is about time that integration is taken to another level in these delivery methods where project members are engaged in a much faster way that allows for real-time monitoring through intuitive interfaces with the help of the technological innovations that transformed the construction industry [33][34][35][36].…”
Section: Project Delivery Methodsmentioning
confidence: 99%
“…Furthermore, a need for more integration in delivering construction projects is critical to cover the limitations of the traditional DBB method, which leads to the development of various cultures that results in severe inefficiency and high costs of inadequate interoperability as well as high levels of data and team fragmentation that even CM and CMR methods were not able to overcome [28][29][30][31]. Indeed, these traditional delivery approaches have historically resulted in a profound number of claims, high risks, delayed schedules and over-priced projects [32]. It is about time that integration is taken to another level in these delivery methods where project members are engaged in a much faster way that allows for real-time monitoring through intuitive interfaces with the help of the technological innovations that transformed the construction industry [33][34][35][36].…”
Section: Project Delivery Methodsmentioning
confidence: 99%
“…Heidemann and Gehbauer (2010) discuss multi-party agreements, integrated form of agreement in the USA and alliancing agreement in Australia, and suggest the adjustment of the existing DBB procedure in Germany. However, sometimes it is not possible to use other forms of procurement than DBB: there are legal, cultural, behavioural, technological and financial barriers against implementing integrated project delivery (Dargham et al 2019).…”
Section: Discussionmentioning
confidence: 99%
“…Sundquist et al (2018)'s study also points out research gaps regarding the actual features of strategic partnering. From a Lean perspective, IPD has, in recent years, been given more attention than strategic partnering (see for example, Dargham et al, 2019 andSimonsen et al, 2019). Only one paper has been found from the literature study with strategic partnering between contractors and designers being the focal point (Lu and Yan (2007)).…”
Section: Strategic Partnering In a Lean Perspectivementioning
confidence: 99%