2018
DOI: 10.1061/(asce)wr.1943-5452.0000912
|View full text |Cite
|
Sign up to set email alerts
|

Impact of Water Resources Development on Water Availability for Hydropower Production and Irrigated Agriculture of the Eastern Nile Basin

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

1
11
0

Year Published

2018
2018
2021
2021

Publication Types

Select...
7

Relationship

1
6

Authors

Journals

citations
Cited by 26 publications
(12 citation statements)
references
References 24 publications
1
11
0
Order By: Relevance
“…Non-cooperative management means optimizing the system of each country to maximize its benefits. The first scenario (S1) is the status quo scenario, of which results have been taken from Digna et al [46], who used the RIBASIM river basin simulation model to simulate the existing system and management conditions of the Eastern Nile Basin. The simulated network in the (S1) represent the existing system in 2015 before the start of operating Settit Dam on Tekeze-Atbara River.…”
Section: Scenario Developmentmentioning
confidence: 99%
See 2 more Smart Citations
“…Non-cooperative management means optimizing the system of each country to maximize its benefits. The first scenario (S1) is the status quo scenario, of which results have been taken from Digna et al [46], who used the RIBASIM river basin simulation model to simulate the existing system and management conditions of the Eastern Nile Basin. The simulated network in the (S1) represent the existing system in 2015 before the start of operating Settit Dam on Tekeze-Atbara River.…”
Section: Scenario Developmentmentioning
confidence: 99%
“…The data used in the simulation model were obtained from Digna et al [46]. The key input data were the physical characteristics of dams, stream flows, evaporation from reservoirs, and irrigation water demands.…”
Section: Symbol Unit Descriptionmentioning
confidence: 99%
See 1 more Smart Citation
“…Following rapidly increasing consumptive uses of the Nile River over the last century and projections of demands expected to significantly exceed the average annual supplies (Nile Basin Initiative [NBI], ), the countries have acknowledged the need for joint planning and management. Numerous studies have demonstrated how the river could be jointly developed (Arjoon et al, ; Blackmore & Whittington, ; Block et al, ; Digna et al, ; Goor et al, ; Guariso & Whittington, ; Jeuland & Whittington, ; van der Krogt & Ogink, ; Wheeler & Setzer, ); however, less attention has been given to specific reservoir operations and the process of reaching an agreement for coordination between countries. New infrastructure that could change the flows of the river should be managed with existing infrastructure to improve the reliability of water to all parties while protecting the riverine environment.…”
Section: Introductionmentioning
confidence: 99%
“…However, coordinated management of water-related infrastructure across the basin's international borders to secure this need has rarely existed, aside from brief colonial efforts to assure reliable flows for agricultural productivity of the Nile delta (Hurst et al, 1947;Tvedt, 2004Tvedt, ). 2008Digna et al, 2018;Goor et al, 2010;Guariso & Whittington, 1987;Jeuland & Whittington, 2013;van der Krogt & Ogink, 2013;Wheeler & Setzer, 2012); however, less attention has been given to specific reservoir operations and the process of reaching an agreement for coordination between countries. New infrastructure that could change the flows of the river should be managed with existing infrastructure to improve the reliability of water to all parties while protecting the riverine environment.…”
Section: Introductionmentioning
confidence: 99%