2013
DOI: 10.1080/00207543.2013.825379
|View full text |Cite
|
Sign up to set email alerts
|

Identical parallel machine scheduling to minimise makespan and total weighted completion time: a column generation approach

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2015
2015
2024
2024

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 9 publications
(2 citation statements)
references
References 24 publications
0
2
0
Order By: Relevance
“…For example, regarding the PMS problem, Min and Cheng (1999) propose a genetic algorithm and Xu and Nagi (2013) provide an exact approach utilizing column generation.…”
Section: A Pdstsp Heuristicmentioning
confidence: 99%
“…For example, regarding the PMS problem, Min and Cheng (1999) propose a genetic algorithm and Xu and Nagi (2013) provide an exact approach utilizing column generation.…”
Section: A Pdstsp Heuristicmentioning
confidence: 99%
“…From a computational point of view has been tackled by various branch-and-bound methods [ 13 17 ], for which determining the optimal solution of instances with 30 or more jobs and two or more identical machines is typically difficult [ 18 ].…”
Section: Introductionmentioning
confidence: 99%