How Integrated Field Studies Help Asset Teams Make Optimal Field Development Decisions

Abstract: Developing an exploitation plan for an oil field has always been challenging. This paper presents different approaches and addresses the important question of how to allocate asset resources to maximize profit. This study presents the analysis of integrated field case studies. Because of their complexities, integrated studies can offer valuable insights. Based on a field's heterogeneity and complexity, it can be relevant to divide it into different investment units. Individual studies can be … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
3
0
1

Year Published

2009
2009
2016
2016

Publication Types

Select...
4
3

Relationship

0
7

Authors

Journals

citations
Cited by 11 publications
(4 citation statements)
references
References 10 publications
0
3
0
1
Order By: Relevance
“…After gathering the key constraints, a typical FEL methodology (Batavia 1999;Saputelli et al 2008aSaputelli et al , 2008b was applied to consider both fixed and variable constraints that directly affected the surface and subsurface planning. The optimal development plan must consider the trade off between the number of pads and the resulting number of targets reached.…”
Section: Planning Methodologymentioning
confidence: 99%
“…After gathering the key constraints, a typical FEL methodology (Batavia 1999;Saputelli et al 2008aSaputelli et al , 2008b was applied to consider both fixed and variable constraints that directly affected the surface and subsurface planning. The optimal development plan must consider the trade off between the number of pads and the resulting number of targets reached.…”
Section: Planning Methodologymentioning
confidence: 99%
“…A qualidade e a consistên-cia das etapas iniciais do projeto predizem os principais resultados e impactam diretamente no sucesso do projeto, pois nelas são definidos escopo, prazo, custo, recursos e efetuado o levantamento dos riscos do projeto (MERROW et al, 2009;SANTIAGO et al, 2008). A metodologia FEL consiste, portanto, em um processo para o desenvolvimento de projetos competitivos que se baseiam na medição do desempenho e aumento do nível de definição do empreendimento com forte atenção às atividades iniciais de um projeto; sendo a avaliação econômica o principal parâmetro para estabelecimento da métrica de desempenho de um projeto (SAPUTELLI et al, 2008).…”
Section: Metodologia Front-end Loadingunclassified
“…More than that, delays in the scheduling affect the field operation preventing the achievement of the production goals (Saputelli et al, 2008). Capital expenditure and resource scheduling is affected for several factors that should be identified on time in order to avoid downtime, cost overruns and substantial resource losses.…”
Section: Field Development and Planningmentioning
confidence: 99%