2020
DOI: 10.1002/2050-7038.12362
|View full text |Cite
|
Sign up to set email alerts
|

Hierarchical damping controller design in large‐scale power systems including hybrid renewable energy sources for compensation of time delays

Abstract: Summary The main purpose of this article is to design a wide‐area damping controller (WADC) considering time delay compensator (TDC) in large‐scale power systems in the presence of renewable energy sources. The TDC is designed to create an opportunity for compensation of uncertainty caused by the phase delay. Then, considering the retrieved uncertainty, H∞/H2 synthesis method is used to make robust the WADC so that the controller can compensate long and continuous delays. This design is done for two hybrid ren… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 33 publications
0
2
0
Order By: Relevance
“…Moreover, this problem is quite complex and mainly studied through fluid mechanics theories. Therefore, the survey of propulsion systems using Flettner rotor on ships should be considered in particular, especially when there are impacts of the superstructure of ships 46 . Some ships are equipped with Flettner rotors entirely to generate thrust and service for the vessel; however, most face the challenge of all ships where the wind is the main energy, when there is no wind the main energy source will be lost.…”
Section: Power Generationmentioning
confidence: 99%
“…Moreover, this problem is quite complex and mainly studied through fluid mechanics theories. Therefore, the survey of propulsion systems using Flettner rotor on ships should be considered in particular, especially when there are impacts of the superstructure of ships 46 . Some ships are equipped with Flettner rotors entirely to generate thrust and service for the vessel; however, most face the challenge of all ships where the wind is the main energy, when there is no wind the main energy source will be lost.…”
Section: Power Generationmentioning
confidence: 99%
“…Table 5 shows the statistical delays in the various studies conducted in the reference paper. The maximum delay to be assessed is 500 ms [62,83].…”
Section: A Robust Telecommunications Analysis Based On the Power Of T...mentioning
confidence: 99%