Heuristic Methods for Finance-Based and Resource-Constrained Project Scheduling Problem

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
2
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 10 publications
(5 citation statements)
references
References 32 publications
0
2
0
Order By: Relevance
“…Figure 5 provides a basis to support lean-integrated 4D BIM in modular construction and lays a more informed ground for scheduling considerations. This process model can also complement many on-going efforts (e.g., [23,32,39]) that looked into 4D BIM in modular projects. The approach in this research further sheds light on object-based complexities in 4D BIM and more importantly overcomes many of the design inefficiencies [7,40].…”
Section: Lean-integrated 4d Bim In Modular Constructionmentioning
confidence: 93%
See 1 more Smart Citation
“…Figure 5 provides a basis to support lean-integrated 4D BIM in modular construction and lays a more informed ground for scheduling considerations. This process model can also complement many on-going efforts (e.g., [23,32,39]) that looked into 4D BIM in modular projects. The approach in this research further sheds light on object-based complexities in 4D BIM and more importantly overcomes many of the design inefficiencies [7,40].…”
Section: Lean-integrated 4d Bim In Modular Constructionmentioning
confidence: 93%
“…Bearing this in mind, there are still risk factors associated, which include damage during transit and the potential for cost-saving materials to be used, which may not be as robust as other materials. Nevertheless, recent research showed that as a result of off-site manufacturing methods such as modular construction, the level of productivity and process efficiency in construction projects have increased [31,32]. To create a meaningful synthesis, and for this research, Figure 1 shows synthesis from the literature connecting lean concepts to modular construction components where impacts on cost and activity planning would be.…”
Section: Lean Integrated With 4d Bim For Modular Constructionmentioning
confidence: 99%
“…We choose this methodology for two reasons. Firstly, genetic algorithm is good at global searching and has been successfully adopted to solve project scheduling problems [13][26] [29][31] [32][40] [43], and secondly, it is easy to generate activity splitting at each iteration by using the crossover and mutation operators. VOLUME XX, 2017…”
Section: Methodsmentioning
confidence: 99%
“…FBS method fulfils the credit-limit constraints imposed on the amounts of the negative overdraft values, which are realized as of the ends of the billing periods. Since FBS was originally introduced by Elazouni and Gab-Allah [35], many research efforts in the literature developed models to solve FBS problems [36][37][38][39][40][41]. However, the FBS models developed in the literature adopt the cash flow exclusively from the perspective of the contractors.…”
Section: Cash Flow Managementmentioning
confidence: 99%