“…Finally, the situation described above might actually never be encountered in engineering projects, where precise dates and durations are often missing, and where one often has to deal with imprecise temporal knowledge. In such cases, using fuzzy durations could be tempting, as suggested in [34] and shown in Figure 7. A duration can be associated to a fuzzy interval, thus enabling several possible durations (and as many possible schedules) for the same activity based on one single linguistic descriptor (a small week, about an hour etc.).…”