2020
DOI: 10.3390/rs12121928
|View full text |Cite
|
Sign up to set email alerts
|

Geo-Registering Consecutive Construction Site Recordings Using a Pre-Registered Reference Module

Abstract: The monitoring of construction sites and the achieved progress is a vital aspect of construction works in the Architecture, Engineering and Construction (AEC) industry. Only if three-dimensional reconstructions require a limited time, the creation of consecutive datasets, portraying the site in subsequent phases, becomes feasible. Moreover, a shared coordinate system between all datasets is essential for monitoring purposes. In this work, a new photogrammetric framework is presented to shift from the current e… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
6
0

Year Published

2020
2020
2022
2022

Publication Types

Select...
5

Relationship

1
4

Authors

Journals

citations
Cited by 5 publications
(6 citation statements)
references
References 29 publications
(32 reference statements)
0
6
0
Order By: Relevance
“…The rising usage of digital methods like Building Information Modeling (BIM) has accelerated this trend. In projects related to construction progress monitoring (Vincke andVergauwen, 2020, Tuttas et al, 2017) the registration is carried out once at the begin of the construction using a classical approach with control points. Image blocks of later points in time are then co-registered with the initial reference frame.…”
Section: Related Workmentioning
confidence: 99%
See 1 more Smart Citation
“…The rising usage of digital methods like Building Information Modeling (BIM) has accelerated this trend. In projects related to construction progress monitoring (Vincke andVergauwen, 2020, Tuttas et al, 2017) the registration is carried out once at the begin of the construction using a classical approach with control points. Image blocks of later points in time are then co-registered with the initial reference frame.…”
Section: Related Workmentioning
confidence: 99%
“…One of the most common feature detectors and used in various applications like object recognition, image retrieval or 3d reconstruction is SIFT, published and patented by Lowe (2004). There are different approaches to speed them up, like SiftGPU (Wu, 2010). But in robotics, when Computer vision needs to work in real-time, other solutions are more common (Miksik and Mikolajczyk, 2012).…”
Section: Image and Correspondence Evaluation Criteriamentioning
confidence: 99%
“…However, the (geo)referencing of a construction site environment is error prone due to occluded markers, the site complexity and GPS denied zones. As such, GPS (geo)referencing accuracy of photogrammetric and lidar processes again is several centimeters in average sized construction sites if costly surveyor teams are not employed [8]. Noise is also rampant in construction sites due to the operations that are accompanied by the presence of temporary objects, workers, dust, vibrations and so on.…”
Section: Construction Site Geometrymentioning
confidence: 99%
“…This is ensured via a pre-registered reference module that incorporates the correct coordinate system. The followed method is described in depth in previous work [8]. The laser scanning dataset is registered via the traditional method of indicating ground control points.…”
Section: Realistic Datamentioning
confidence: 99%
See 1 more Smart Citation