2002
DOI: 10.1061/(asce)0733-9364(2002)128:5(418)
|View full text |Cite
|
Sign up to set email alerts
|

Genetic Algorithms for Construction Site Layout in Project Planning

Abstract: Construction site layout is concerned with the existence, positioning, and timing of the temporary facilities that are used to carry out a construction project. Typically these problems are very complicated to formulate and difficult to solve. They are, however, very important to virtually any construction project, since the site layout can significantly affect the cost of the project. This paper describes the general site layout problem from both a theoretical and a practical point of view. It proposes geneti… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
50
0
5

Year Published

2003
2003
2023
2023

Publication Types

Select...
4
3
2

Relationship

0
9

Authors

Journals

citations
Cited by 123 publications
(55 citation statements)
references
References 13 publications
0
50
0
5
Order By: Relevance
“…By using the actual daily interest rate the financing cost for each phase is calculated for each construction material (m) in each phase (t). Table 6 shows the conducted financing cost values [20].…”
Section: Financing Cost Calculationsmentioning
confidence: 99%
See 1 more Smart Citation
“…By using the actual daily interest rate the financing cost for each phase is calculated for each construction material (m) in each phase (t). Table 6 shows the conducted financing cost values [20].…”
Section: Financing Cost Calculationsmentioning
confidence: 99%
“…The layout cost is based on the material handling cost (MHC), while there was no site reorganization cost (SRC) since the layout was stable along the project duration with no relocation. The material handling cost is calculated using the actual construction materials quantities, actual storage areas location on site as shown in Figure 9 and materials handling data given [20]. The layout cost for each construction phase (T) is shown in Table 6.…”
Section: Layout Cost Calculationsmentioning
confidence: 99%
“…To maximise the efficiency of this spatial assignment, early contractor involvement is also encouraged (Harris et al 2006;Guo 2009) coupled with extensive communication among the parties (Mossey 2009), predominantly in the identification and assignment of space prior to commencing on-site (Song et al 2009). Mawdesley et al (2002) identify the reasoning behind drafting a site layout plan prior to commencing on-site. This includes the difficulty in specifying the requirements and assignment of space caused by the complexity and dynamic nature of the construction process coupled with the interchanging nature of the various tasks requiring completion.…”
Section: Draft and Implement An Effective Design Site Layout Prior Tomentioning
confidence: 99%
“…A construction site with a good quality planning allows for a reduction in travel time, minimizes unnecessary material transportation, and significantly impacts the economy, safety as well as other aspects of the construction (Mawdesley et al 2002).…”
Section: Introductionmentioning
confidence: 99%