1999
DOI: 10.1061/(asce)0887-3801(1999)13:3(207)
|View full text |Cite
|
Sign up to set email alerts
|

Fuzzy Optimal Model for Resource-Constrained Construction Scheduling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
10
0

Year Published

2000
2000
2017
2017

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 37 publications
(10 citation statements)
references
References 22 publications
0
10
0
Order By: Relevance
“…Self mutation [6] is used in this study. If a chromosome is selected for mutation, two genes are randomly selected for exchanging their values.…”
Section: Mutationmentioning
confidence: 99%
“…Self mutation [6] is used in this study. If a chromosome is selected for mutation, two genes are randomly selected for exchanging their values.…”
Section: Mutationmentioning
confidence: 99%
“…Leu et al. () extended a genetic algorithm (GA) for resource leveling to overcome other old algorithms, in which the GA has been used for showing the difference between traditional and heuristic approaches. Leu et al.…”
Section: Introductionmentioning
confidence: 99%
“…Existing approaches for reducing schedule durations include time-cost trade-off (e.g., [3][4][5][6]) and resource-constrained scheduling (e.g., [7][8][9][10]). These methods assume that existing sequences in CPM schedules are fixed and that the primary method for acceleration is to add or reallocate resources.…”
Section: Introductionmentioning
confidence: 99%