31st Annual Conference of IEEE Industrial Electronics Society, 2005. IECON 2005. 2005
DOI: 10.1109/iecon.2005.1569000
|View full text |Cite
|
Sign up to set email alerts
|

Fuzzy ARTMAP based forecast of renewable generation for a high frequency AC microgrid

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
7
0

Year Published

2006
2006
2022
2022

Publication Types

Select...
4
3
1

Relationship

0
8

Authors

Journals

citations
Cited by 11 publications
(7 citation statements)
references
References 11 publications
0
7
0
Order By: Relevance
“…Later, a fuzzy system is implemented to put into practice the optimal strategies previously found. In addition, the parameters of the fuzzy system were adapted by a genetic algorithm; meanwhile, in [78] ca be seen a strategy employed for the prediction of time series to regulate the dispatch of energy.…”
Section: Energy Dispatchmentioning
confidence: 99%
“…Later, a fuzzy system is implemented to put into practice the optimal strategies previously found. In addition, the parameters of the fuzzy system were adapted by a genetic algorithm; meanwhile, in [78] ca be seen a strategy employed for the prediction of time series to regulate the dispatch of energy.…”
Section: Energy Dispatchmentioning
confidence: 99%
“…The shunt inverter can be located either on the right (thus the name right shunt UPQC (UPQC-R)) [7]- [20], [22], [23], [25], [26], [28]- [40], [42], [44]- [56], [58]- [84], [86]- [97], [99]- [127], [129]- [144], [153]- [168] or left (hence the name left shunt UPQC (UPQC-L)) [7], [21], [24], [27], [41], [43], [57], [85], [98], [128], [145], [152] side of the series inverter.…”
Section: ) Right and Left Shunt Upqc (Upqc-r And Upqc-l)mentioning
confidence: 99%
“…Chakraborty and M.G. Simoes in [99] and in [100], focus on renewable energy sources integration in a distributed generation system, implementing a distributed intelligent EMS to optimize operating costs. A Fuzzy ARTMAP Neural Network is used to predict hourly day-type outputs, based on which generation can be forecasted.…”
Section: Operation Scheduling: Economic Load Dispatch Problemmentioning
confidence: 99%