Thii report wu prepared ai an account of work sponsored by an agency of the United Stitet Government. Neither the United Statec Government flor any agency thereof, nor any of their employees, makei any warranty, expreu or implied, or auumei any legal liability or reiponsi-bility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents thiil its use would not infringe privately owned rights. Refer-ence herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recom-mendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. 10 Fusion burn goals to equate cyclic and radiation life of first wall; sputtering is negligible. 25 11 Complete OHC winding cost ($1983) and approximate flux versus cyclic life; B 0H = 10.0 T, R o -8.0 m, 316 LN structure 29 12 EFC winding cost ($1983) versus cyclic life for full field swing (OH burn cycle) and half field swing (hybrid burn cycle); 8-m reactor, 316 LN structure. 30 13 Fracture mechanics limited stress, 316 LN (annealed) at 293°K 33 14 Structure cost for TFC vacuum cases and shear panels. 35 15 Volumetric average temperature response: 30-s dwell 38 16 RF capital cost modeling and data 41 17 Power supply system for a conventional OH cycle. 43 IS Energy transfer system cost for a conventional OH double-swing cycle as a function of cycle parameters for a water thermal storage system. 46 iv A COMPARATIVE STOUT OF PULSED AMD