Frequency response of prime movers during restoration

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
35
0

Year Published

2013
2013
2020
2020

Publication Types

Select...
4
3

Relationship

0
7

Authors

Journals

citations
Cited by 70 publications
(36 citation statements)
references
References 1 publication
0
35
0
Order By: Relevance
“…But it is assumed that the load demand change occurs in both areas and the sum of the column entries of the DPM matrix is more than unity. FRI 5 , FRI 6 , FRI 7 and FRI 8 or ε 1 , ε 2 , ε 3 , ε 4 , ε 5 , ε 6 , ε 7 , and ε 8 are calculated are tabulated in Table 3 and Table 5.…”
Section: Casementioning
confidence: 99%
See 1 more Smart Citation
“…But it is assumed that the load demand change occurs in both areas and the sum of the column entries of the DPM matrix is more than unity. FRI 5 , FRI 6 , FRI 7 and FRI 8 or ε 1 , ε 2 , ε 3 , ε 4 , ε 5 , ε 6 , ε 7 , and ε 8 are calculated are tabulated in Table 3 and Table 5.…”
Section: Casementioning
confidence: 99%
“…A lot of studies have been made related to LFC in a deregulated environment over last decades. These studies try to modify the conventional LFC system to take into account the effect of bilateral contracts on the dynamics [3] and improve the dynamical transient response of the system [4][5][6][7] under various operating conditions. With the restructured electric utilities, the Load-Frequency Control requirements especially the nominal frequency in an interconnected power system besides maintaining the net interchange of power between control areas at predetermined values should be enhanced to ensure the quality of the power system.…”
Section: Introductionmentioning
confidence: 99%
“…where n G is the number of conventional generation units; P Gi is the active output power of unit i in the restored system; P min_j is the minimum output power of wind farm j; 4f max is the maximum variation allowed which is 0.5 Hz in this paper; and df i is the transient frequency response coefficient of unit i [21]. The minimum output power of wind farm j can be formulated as:…”
Section: Constraintsmentioning
confidence: 99%
“…In this section, a robust optimization model [20,21] is proposed to optimize the dispatched power of wind farms, in order to ensure the security of the restored system.…”
Section: Robust Optimization Model Of Dispatched Powermentioning
confidence: 99%
“…where P BSUni and P NBSUnj are the active rated power of BSU i and NBSU j, respectively; ∆ f max is the permitted frequency drop; f di and f dj are the frequency response rate of BSU i and NBSU j, which can be obtained from reference [24].…”
Section: Maximum Power Constraint To Load Pick-up At One Timementioning
confidence: 99%