All Days 2000
DOI: 10.4043/12142-ms
|View full text |Cite
|
Sign up to set email alerts
|

FPSO Integrity: JIP on FPSO Fatigue Loads

Abstract: The hull forms used for FPSOs and trading tankers look very similar. So similar in fact that it may appear that one could use the same design and design methods for both vessels. Both vessels will be subject to extreme and fatigue loading and both will have a similar design life. But each will have different design requirements and therefore different designs.The trading tanker spends most of its life moving oil from one location to another, in either one of two draft conditions, ballast or laden. They are dry… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2000
2000
2019
2019

Publication Types

Select...
5
3

Relationship

1
7

Authors

Journals

citations
Cited by 11 publications
(4 citation statements)
references
References 0 publications
0
4
0
Order By: Relevance
“…To obtain experience with the FPSO hull loading monitoring, several Joint Industry Projects such as Integrity I and II JIP [14] and Capacity II JIP [5] were initiated. To obtain experience with the FPSO hull loading monitoring, several Joint Industry Projects such as Integrity I and II JIP [14] and Capacity II JIP [5] were initiated.…”
Section: Crackmentioning
confidence: 99%
“…To obtain experience with the FPSO hull loading monitoring, several Joint Industry Projects such as Integrity I and II JIP [14] and Capacity II JIP [5] were initiated. To obtain experience with the FPSO hull loading monitoring, several Joint Industry Projects such as Integrity I and II JIP [14] and Capacity II JIP [5] were initiated.…”
Section: Crackmentioning
confidence: 99%
“…A joint industry project on measurements of load effects on a floating production ship is presently going, see Bultema et al 16 .Therefore the aim of the project described in the present paper is to complement the ongoing JIP with emphasis on the capacity side to improve the basis for stress concentration factors and S-N data. Thus a minor error in determination of one parameter may lead to a significant deviation in predicted fatigue life.…”
Section: Motivationmentioning
confidence: 99%
“…The background, objectives and structure of the project are described in further detail in ref [1]. The background, objectives and structure of the project are described in further detail in ref [1].…”
Section: Introductionmentioning
confidence: 99%