All Days 2000
DOI: 10.4043/12143-ms
|View full text |Cite
|
Sign up to set email alerts
|

FPSO Integrity; Structural Monitoring of Glas Dowr

Abstract: The objective of the Joint Industry project 'FPSO Integrity' is to provide insight in the fatigue loading of FPSO's and the accuracy and validity of computational models. The results should contribute to reliable life time prediction and site assessment studies for this relative new concept of production.Within the frame work of this JIP, 'Glas Dowr', a new build double hull FPSO operated by Bluewater for Amerada Hess at the Durward and Dauntless fields in the North Sea, has been instrumented extensively. The … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2003
2003
2015
2015

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 2 publications
(2 reference statements)
0
1
0
Order By: Relevance
“…In the Integrity JIP [12], draughts of a FPSO were recorded for two years, as shown in Stress-range calculation. In the Integrity JIP [12], draughts of a FPSO were recorded for two years, as shown in Stress-range calculation.…”
Section: Crackmentioning
confidence: 99%
“…In the Integrity JIP [12], draughts of a FPSO were recorded for two years, as shown in Stress-range calculation. In the Integrity JIP [12], draughts of a FPSO were recorded for two years, as shown in Stress-range calculation.…”
Section: Crackmentioning
confidence: 99%