Formwork System Selection Model for Tall Building Construction Using the Adaboost Algorithm

Abstract: In a tall building construction with reinforced concrete structures, the selection of an appropriate formwork system is a crucial factor for the success of the project. Thus, selecting an appropriate formwork system affects the entire construction duration and cost, as well as subsequent construction activities. However, in practice, the selection of an appropriate formwork system has depended mainly on the intuitive and subjective opinion of working-level employees with restricted experience. Therefore, in th… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
16
0

Year Published

2016
2016
2024
2024

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 12 publications
(16 citation statements)
references
References 14 publications
0
16
0
Order By: Relevance
“…Desai and Joshi (2010) used a decision tree to analyze labor productivity in construction projects [23]. Shin (2011) proposed the AdaBoost algorithm for the selection of a framework system in construction projects [24]. The algorithm was compared with an ANN model and the results revealed that the AdaBoost algorithm performed with better accuracy than the ANN model.…”
mentioning
confidence: 99%
“…Desai and Joshi (2010) used a decision tree to analyze labor productivity in construction projects [23]. Shin (2011) proposed the AdaBoost algorithm for the selection of a framework system in construction projects [24]. The algorithm was compared with an ANN model and the results revealed that the AdaBoost algorithm performed with better accuracy than the ANN model.…”
mentioning
confidence: 99%
“…The problem of selecting optimal formwork systems has been extensively studied in the literature [17][18][19][20]. A number of studies have proposed the application of neural network theory or expert systems [19,[21][22][23]. To assist the contractor with the formwork selection problem, Shin et al [24] presented a decision-support model using AdaBoost to select a formwork system suitable for the construction site conditions.…”
Section: Formwork Selection Problemmentioning
confidence: 99%
“…An appropriate formwork system is always cost and labor effective. Formwork always determines the cycle per floor of high rise building which affects the construction cost and subsequent activities [30]. Selection of formwork for a construction is mostly based on experience or decided by the high level authority in an organization.…”
Section: Introductionmentioning
confidence: 99%