2018 International Symposium on Computer, Consumer and Control (IS3C) 2018
DOI: 10.1109/is3c.2018.00037
|View full text |Cite
|
Sign up to set email alerts
|

Formulation of Low Voltage Ride-Through Curve Considering Offshore Wind Farms Integrated into an Islanding Power System - A Case Study in Taiwan

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
5
0

Year Published

2019
2019
2022
2022

Publication Types

Select...
2

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(5 citation statements)
references
References 1 publication
0
5
0
Order By: Relevance
“…In [107], a voltage stability analysis based on a control model was proposed. The method is suitable for large offshore wind farms integrated into the power system.…”
Section: Analysis and Verification Case Studies With Integrated Wind ...mentioning
confidence: 99%
“…In [107], a voltage stability analysis based on a control model was proposed. The method is suitable for large offshore wind farms integrated into the power system.…”
Section: Analysis and Verification Case Studies With Integrated Wind ...mentioning
confidence: 99%
“…Table 2 lists the 19 fault scenarios, 10 of which occurred in the 161-kV circuit and nine in the 345-kV circuit. Nantou E (2400) Nantou E (2400)-Chuanhsiang E (2350) 1st line Fault 19 Chiamin E (2500) Chiamin E (2500)-Chungliaopei E (2480) 1st & 2nd line Tables 3 and 4 show when the bus in the Taipower grid fails, and whether the OWT connection points will recover to 90% of rated voltage in three seconds after the fault occurs [26]. According to the results, when an accident occurs in an adjacent offshore wind farm, the OWT connection points will recover to 90% of rated voltage in 3 seconds at accident time points 0.1 second, 0.14 second, and 0.15 second.…”
Section: Establishment Of the Value Of Point D-fult Cearing Tme Of Ofmentioning
confidence: 99%
“…According to [25], when the fault is the most serious three-phase short-circuit fault, the minimum voltage at the OWT connection point is obtained, i.e., the valley of voltage at the OWT connection point at fault times of 0.15 second, 0.2 second, 0.5 second, and 0.625 second occur when the three-phase short-circuit fault happens in an adjacent offshore wind farm bus. Figures 5 illustrates the wind turbines minimum PCC voltages in the TPC system for varying fault durations and scenarios [26]. Table 5 shows the minimum voltage of each wind farm at PCC.…”
Section: Establishment Of the Values Of Point E To Point G-aalysis Ofmentioning
confidence: 99%
See 2 more Smart Citations