Flexible Pipe Systems Configurations for the Pre-Salt Area

Abstract: Unbonded flexible pipes are being considered as an actual solution for the following developments for the Brazilian Pre-Salt area. This technology is already being successfully used in the first EWT installed in the Brazilian Pre-salt and being qualified for the first Pre-salt Pilot Project development. However, unlikely the current project developments in water depths around 1500m, the free catenary configuration is not always an applicable option not only due to the 2500m water depth but also to the presence… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2020
2020
2021
2021

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…Wells drilled in the Brazilian pre-salt basin are connected to surface platforms by flexible pipelines that better fits to the high water depths. Pipe Laying Support Vessels (PLSVs) are responsible for loading these pipelines at the port, transporting them to the wells site, laying them out in the ocean, and connecting them between the wells and platforms, allowing production to start (Speight, 2015;Clevelario et al, 2010). The PLSV Scheduling Problem (PLSVSP) consists of servicing a demand of sub-sea oil wells connections, finding the best schedule for a limited PLSV fleet, prioritizing the completion of wells with higher production levels.…”
Section: Introductionmentioning
confidence: 99%
“…Wells drilled in the Brazilian pre-salt basin are connected to surface platforms by flexible pipelines that better fits to the high water depths. Pipe Laying Support Vessels (PLSVs) are responsible for loading these pipelines at the port, transporting them to the wells site, laying them out in the ocean, and connecting them between the wells and platforms, allowing production to start (Speight, 2015;Clevelario et al, 2010). The PLSV Scheduling Problem (PLSVSP) consists of servicing a demand of sub-sea oil wells connections, finding the best schedule for a limited PLSV fleet, prioritizing the completion of wells with higher production levels.…”
Section: Introductionmentioning
confidence: 99%
“…The Pipe-Laying Support Vessel (PLSV) is a ship specially designed to connect pipelines between sub-sea oil wells and production platforms in ultra-deep waters. These vessels are responsible for loading the pipelines at the port, transporting them to the wells' location, laying them out in the ocean, and connecting them between the wells and platforms, allowing production to begin (Speight 2015, Clevelario et al 2010.…”
Section: List Of Abbreviations 1 Introductionmentioning
confidence: 99%