2014
DOI: 10.1080/00207543.2014.955925
|View full text |Cite
|
Sign up to set email alerts
|

Flexible job shop with continuous material flow

Abstract: This document describes the material flow model (MFM) in details. It presents mathematical basics of the formalism and introduces its properties. A short implementation note is also given.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
9
0

Year Published

2015
2015
2021
2021

Publication Types

Select...
4
4

Relationship

0
8

Authors

Journals

citations
Cited by 19 publications
(9 citation statements)
references
References 27 publications
0
9
0
Order By: Relevance
“…minimisation of maximal lateness) and an equal machine utilisation over time. Bożek and Wysocki (2015) analysed continuous flow flexible job shop (CF-FJS) problem that combines the flexible job shop (FJS) problem and a dedicated continuous material flow model (MFM). In this study, the operations are represented by material flow functions derived by integration of arbitrarily defined speed patterns.…”
Section: Literature Reviewmentioning
confidence: 99%
See 1 more Smart Citation
“…minimisation of maximal lateness) and an equal machine utilisation over time. Bożek and Wysocki (2015) analysed continuous flow flexible job shop (CF-FJS) problem that combines the flexible job shop (FJS) problem and a dedicated continuous material flow model (MFM). In this study, the operations are represented by material flow functions derived by integration of arbitrarily defined speed patterns.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Examples of such problems can be found in the studies by Kyparisis and Koulamas (2006) and Tahar et al (2006) and Bożek and Wysocki (2015). The peculiarity of the problem under consideration is the simultaneous consideration of both machine structure selection, continuous flows, and job assignment.…”
Section: Introductionmentioning
confidence: 97%
“…These systems are the MSS and constitute a variant of Business Information tools, i.e. information systems supporting business functions, such as those provided by the SIEMENS PREACTOR business unit or SAP's integrated management systems (Bożek and Wysocki 2015). Framinan and Ruiz (2010) The system is constituted by the following components: a Database Management module, an Automatic Schedule Generator, a Schedule Editor and a Performance Evaluator.…”
Section: Manufacturing Scheduling Systemsmentioning
confidence: 99%
“…Demir and Işleyen 2014), others are based on hybrid methods combining FJS problem and a dedicated continuous material flow model (Bozek and Wysocki 2015) or as a combination of group constraint with flexible flow shop to minimize makespan (Kurz and Askin 2004;Logendran et al 2005). In some other cases authors studied a hybrid flow shop scheduling problem with assembly operations at stage two (Fattahi et al 2014;Yokoyama 2004;Riane et al 2002;Wang and Liu 2013).…”
Section: Literature Reviewmentioning
confidence: 99%