2000
DOI: 10.2172/804822
|View full text |Cite
|
Sign up to set email alerts
|

Fire Hazard Analysis for the Cold Vacuum Drying facility (CVD) Facility

Abstract: sheet no. and rev.) CanmlNoid 0 (See Block 13a) N/A N/A 0 Yes (fill out Elk. 12b) 2a. Modification Work 12b. Work Package No. N/A N/A * N /A 12c. Modification Work Completed 12d. Restored to Ori inal Condition (Temp. or Standby EC& only) Design AuthorityICo Engineer Signature 8 Design AuthorityICo Engineer Signature 8 o NA Blks. 1% ' 12c, 12d) Bate Bete 3a. Description of Change 1 % Design Baseline Document? Yes 0 No Jpdate to the Fire Hazard Analysis (FHA) SNF-4268 Rev 0. G S To account for higher allowable t… Show more

Help me understand this report

This publication either has no citations yet, or we are still processing them

Set email alert for when this publication receives citations?

See others like this or search for similar articles