Feedback Design of Temperature Control Measures for Concrete Dams based on Real-Time Temperature Monitoring and Construction Process Simulation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
11
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
10

Relationship

1
9

Authors

Journals

citations
Cited by 31 publications
(11 citation statements)
references
References 10 publications
0
11
0
Order By: Relevance
“…Imperfections along the glass fibers reflect the laser light. The reflection spot of the laser light can be localized as [8,28]:…”
Section: Distributed Temperature Sensing (Dts) Technologymentioning
confidence: 99%
“…Imperfections along the glass fibers reflect the laser light. The reflection spot of the laser light can be localized as [8,28]:…”
Section: Distributed Temperature Sensing (Dts) Technologymentioning
confidence: 99%
“…Pei et al [19] combined a response surface model and a genetic algorithm to determine the concrete thermal parameters according to the internal temperature data of a dam, which improved the computational efciency. Zhou et al [20] frst used the dam monitoring temperature and FEM to obtain the datasets, and then used BPNN to establish a mapping model between thermal parameters and concrete temperature. Finally, GA was used to invoke the trained neural network model to obtain the thermal parameters.…”
Section: Introductionmentioning
confidence: 99%
“…Afterwards, Zhong [12] established a real-time construction progress control model that considered temperature information and quality inspection information during the construction period. Zhou [13] also proposed a simulation model that combined the real-time temperature monitoring data and the actual construction schedule within the temperature field simulation model. Although these studies provide technical support for arch dam construction schedule analysis and management, the current construction simulation model cannot accurately simulate the joint grouting construction time.…”
Section: Introductionmentioning
confidence: 99%