2020
DOI: 10.1088/1757-899x/807/1/012016
|View full text |Cite
|
Sign up to set email alerts
|

Feasibility Study of Micro Hydropower Plants in High-Rise Buildings in Indonesia By Utilizing A Working Scheme for AC Condenser Water Pumps (Ventilation & Air Conditioning System)

Abstract: In Indonesia the number of high-rise buildings above 150 m tends to increase, according to CTBUH (Council on tall building and urban habitat) in 2018 there are 85 buildings and those that are under construction are 26 buildings, Super tall buildings with a height above 300 meters are 4 buildings and proposed mega tall building with a height of more than 600 meters is 1 building. All these buildings have very large electrical loads. The percentage of electricity consumption in the building that is the object of… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 2 publications
0
0
0
Order By: Relevance