2021
DOI: 10.31258/ijeepse.4.1.121-126
|View full text |Cite
|
Sign up to set email alerts
|

Feasibility Study of Hydro Power Plant (HPP) Lubuak Gadang Sangir South Solok

Abstract: The feasibility study is one of the principal documents in building a hydropower plant consisting of technical, economic, and financial aspects. Contained technical studies on civil, mechanical, and electrical. This requires data on hydrologic, geology, land contours, river discharge, water catchment areas, and so on. Economic and financial studies include cost and financial parameters such as; BEP, IRR, NVP, BCR, and others. The installed capacity of a hydropower plant is given in optimization based on the Fl… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2021
2021

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 7 publications
0
1
0
Order By: Relevance
“…Therefore, the waste can generate electrical energy, a more detailed calculation of the potential generated is needed [3]. With the research and analysis on the possibility of waste in Pangkalpinang city as a fuel for power plants, it is hoped that it can be an illustration in Pangkalpinang that a waste power plant is established [4].…”
Section: Introductionmentioning
confidence: 99%
“…Therefore, the waste can generate electrical energy, a more detailed calculation of the potential generated is needed [3]. With the research and analysis on the possibility of waste in Pangkalpinang city as a fuel for power plants, it is hoped that it can be an illustration in Pangkalpinang that a waste power plant is established [4].…”
Section: Introductionmentioning
confidence: 99%