2004
DOI: 10.1080/09593332508618472
|View full text |Cite
|
Sign up to set email alerts
|

Feasibility Studies and Pre-design Simulation Of Warsaw's New Wastewater Treatment Plant

Abstract: The proposed transfer of wastewater from the western part of Warsaw, across the Wisla (Vistula) River for joint treatment at the existing eastern side "Czajka" wastewater treatment plant (WWTP) will result in combined winter flows of approx. 580,000 m3 d(-1). One-year of pilot-scale studies defined the COD characteristics and kinetics of nitrogen removal and VFA production from primary sludge. BioWin simulation was used to size and price the optional processes and pointed to the Westbank process as the most co… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
6
0

Year Published

2009
2009
2021
2021

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 10 publications
(8 citation statements)
references
References 0 publications
0
6
0
Order By: Relevance
“…Several case studies have demonstrated the applicability of modelling and simulation for the design purposes ranging from simple small plants to complex large plants (Daigger and Nolasco 1995;Bingley and Upton 2000;Gabaldon et al 2000;Larrea et al 2001;Rivas et al 2001;Oleszkiewicz et al 2004;Seco et al 2004). Simulation results can be used not only to make direct decisions on investments but also to verify the proposed design assumptions (Gorgun et al 1996b;Coen et al 1997).…”
Section: Design Of New Facilitiesmentioning
confidence: 99%
“…Several case studies have demonstrated the applicability of modelling and simulation for the design purposes ranging from simple small plants to complex large plants (Daigger and Nolasco 1995;Bingley and Upton 2000;Gabaldon et al 2000;Larrea et al 2001;Rivas et al 2001;Oleszkiewicz et al 2004;Seco et al 2004). Simulation results can be used not only to make direct decisions on investments but also to verify the proposed design assumptions (Gorgun et al 1996b;Coen et al 1997).…”
Section: Design Of New Facilitiesmentioning
confidence: 99%
“…However, the implementation of this process can cause some handling problems and considerably increase the operating costs, especially at large wastewater treatment plants (WWTPs) (WEF, 2005). For example, Oleszkiewicz et al (2004) estimated that 100 to 150 tons/d of 10% methanol would be needed to remove 2 to 4 g N/m 3 of nitratenitrogen (NO 3 -N) to achieve an effluent limit of total nitrogen of 10 g N/m 3 at the Czajka WWTP in Warsaw (Q 5 580 000 m 3 /d).…”
Section: Introductionmentioning
confidence: 99%
“…This was especially ideal for short-term solution, but also viable for long term if a cheap and abundant external carbon sources could be secured. Hence, finding an alternative cost-effective external carbon substance was listed amongst the priorities of the wastewater treatment industry during WEF 2005 [8] and have been going on for the past two decades [12]. The focus was mostly on local industrial waste products/ by-products that is rich in carbon, where they were addressed to be 'highly recommended especially if one WWTP can has the access' [12].…”
Section: Introductionmentioning
confidence: 99%