2017
DOI: 10.1016/j.engfailanal.2017.06.025
|View full text |Cite
|
Sign up to set email alerts
|

Failure of bolt support and experimental study on the parameters of bolt-grouting for supporting the roadways in deep coal seam

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
25
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 70 publications
(25 citation statements)
references
References 18 publications
0
25
0
Order By: Relevance
“…The discontinuous area in ultra‐thick coal seams with parting is likely to occur separation . Then under the influences of underground pressure, the chamber is extremely easy to occur rib spalling and roof falling, thus increasing the difficulty in chamber support …”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…The discontinuous area in ultra‐thick coal seams with parting is likely to occur separation . Then under the influences of underground pressure, the chamber is extremely easy to occur rib spalling and roof falling, thus increasing the difficulty in chamber support …”
Section: Introductionmentioning
confidence: 99%
“…5,6 Then under the influences of underground pressure, the chamber is extremely easy to occur rib spalling and roof falling, thus increasing the difficulty in chamber support. 7,8 Currently, many researches on large-section chamber or roadway support have been carried out. Fan et al 9 used the numerical method to study the blasting-induced plastic failure of large-section chamber surrounding rocks.…”
Section: Introductionmentioning
confidence: 99%
“…Since the increase in bolt length causes also increases in the stresses induced in the bolt steel material, the steel failure becomes possible instead of the sliding at the friction surface. The increase in the bolt length sometimes has not a positive effect on the load capacity, because the strength of the bolt steel material can make limitations in case of using high bolt lengths [29][30][31][32]. The maximum bolt length was 5 m in this study.…”
Section: Discussionmentioning
confidence: 91%
“…Researchers have developed some techniques to improve the bearing capacities of the surrounding rocks and reduce the convergence of roadways developed under high‐stress environment . Those techniques include the pumpable cribs, the strong rib/roof bolting, and many others summarized in Peng .…”
Section: Introductionmentioning
confidence: 99%
“…1,6 Researchers have developed some techniques to improve the bearing capacities of the surrounding rocks and reduce the convergence of roadways developed under high-stress environment. 1,[7][8][9][10][11] Those techniques include the pumpable cribs, the strong rib/roof bolting, and many others summarized in Peng. 12 However, field observations indicate that those techniques often have limited effects upon reducing the large deformation of surrounding rocks, primarily because the artificial reinforcement is far more uncompetitive to the | 1405 WANG et Al.…”
Section: Introductionmentioning
confidence: 99%