2019
DOI: 10.1061/(asce)cf.1943-5509.0001284
|View full text |Cite
|
Sign up to set email alerts
|

Factors Influencing Facilities Management Cost Performance in Building Projects

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
13
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 36 publications
(24 citation statements)
references
References 44 publications
0
13
0
Order By: Relevance
“…Previous studies by Myeda and Pitt (2014), Odediran et al (2015), Ikedaishi and Okwuashi (2015) and Islam et al (2019) have reported that several factors influence effective FM practices in public buildings. Following a comprehensive evaluation of this research, this study found 22 possible factors shown in Table 3.…”
Section: Methodsmentioning
confidence: 92%
“…Previous studies by Myeda and Pitt (2014), Odediran et al (2015), Ikedaishi and Okwuashi (2015) and Islam et al (2019) have reported that several factors influence effective FM practices in public buildings. Following a comprehensive evaluation of this research, this study found 22 possible factors shown in Table 3.…”
Section: Methodsmentioning
confidence: 92%
“…The design and construction stages should have the ability to take preventive actions against possible inefficiencies. Consequently, integration of FM in the design phase gives true-life information to designers so that the operation stage is ensured to be highly profitable (Islam et al, 2019). Additionally, megaprojects require complex systems to be operable.…”
Section: Ijmpb 136mentioning
confidence: 99%
“…The mapping mechanism between a cost control unit and one or more unit tasks can be obtained by establishing a contrast reaction relationship between EBS and CBS [5] . According to the corresponding relationship mechanism, the life cycle cost mapping model of modular substation project was established as shown in Figure 3.…”
Section: The Life Cycle Cost Mapping Model Of the Project Of Modular mentioning
confidence: 99%