Due to the lack of high standardization and specialization, the production scale of modular substation is difficult to meet the established requirements. Compared with traditional substation construction, there are still practical problems such as high production costs. Therefore, it is still difficult to promote modular substation. Considering the life cycle of modular substation project, Cost Breakdown Structure (CBS) and Engineering Breakdown Structure (EBS) of the modular substation were defined through literature reading and data analysis. Then use the life cycle cost mapping model to further determine the mapping relationship between CBS and EBS. Finally, the connotation and goal of the life cycle cost optimization of modular substation were proposed, which can effectively promote the cost management of modular substation projects and optimization.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.