Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects

Abstract: Due to the loss of financial resources and the need to optimize projects, academics, politicians and the construction industry have become increasingly aware of the challenges presented by the frequent time and cost overruns and reduced quality level of construction projects. The purpose of this study is to analyse the factors that project managers experience as having the greatest effect on time, cost and quality, and to discover whether the factors' effects are significantly different from each other. A ques… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

3
132
0
12

Year Published

2017
2017
2022
2022

Publication Types

Select...
5
3
2

Relationship

0
10

Authors

Journals

citations
Cited by 245 publications
(152 citation statements)
references
References 51 publications
3
132
0
12
Order By: Relevance
“…The fourth part analysed the quality factors, and the success factors were analysed in the fifth part. The ranking was conducted according to importance (Relative Importance Index -RII) and the respondents were grouped into investors, contractors, and project managers [27,28]. Ranking RII is made according to the expression (1): (1) where: Σw -sum of grades given to each factor A -max.…”
Section: Questionnaire and Statistical Methodsmentioning
confidence: 99%
“…The fourth part analysed the quality factors, and the success factors were analysed in the fifth part. The ranking was conducted according to importance (Relative Importance Index -RII) and the respondents were grouped into investors, contractors, and project managers [27,28]. Ranking RII is made according to the expression (1): (1) where: Σw -sum of grades given to each factor A -max.…”
Section: Questionnaire and Statistical Methodsmentioning
confidence: 99%
“…Artículos Incumplimiento y problemas en [2], [7], [16], [15] [17] general con subcontratistas Calamidades climáticas [16], [18], [19] Condiciones gubernamentales [16] Cambios en el alcance del [5], [7], [9], [18], [20] contrato por parte del dueño Escasez de trabajadores [9], [18], [21] Mano de obra no calificada [1], [7], [9], [18], [19], [20] Mala planeación y programación [2], [3], [5], [6], [7], [9], [11], [12], [17], [20], [22] por parte del contratista Falta de comunicación entre las [5], [17] diferentes partes involucradas en los proyectos. Fluctuaciones de la moneda [1] Cambios en los diseños [11], [12], [18], [19], [23] Conflictos laborales y huelgas [17], [18] En India, por ejemplo, se encontró que en promedio, entre una muestra de 290 proyectos, existía una excedencia en costos del 73 % [5].…”
Section: Factorunclassified
“…A study by Mahamid et al [6] on a time performance of road construction projects in the West Bank in Palestine explored the views of contractor and consultant on causes of delays and revealed that contractor and consultant suffer from many problems which affect the project performance negatively. According to Larsen et al [40], construction project schedule, budget, and quality is affected in significantly different ways in Denmark construction industry and found the lack of project funding, omissions in consultant material, and omissions in construction work to be the most critical factors affecting project time, cost, and quality. Odeh and Battaineh [41] studied the main causes of construction delay and explored that the extensive delays are the cause of costly disputes and claims among contractor and consultant.…”
Section: Previous Studies On the Causes And Effects Of Delays In Consmentioning
confidence: 99%