Proceedings of SPE/IADC Drilling Conference 2005
DOI: 10.2523/92371-ms
|View full text |Cite
|
Sign up to set email alerts
|

Extended Reach Drilling in the GOM - Ram Powell Case Study

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2005
2005
2006
2006

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…2 The results of the real time data were compared to models and indicated that a stiffer workstring was desired to minimize buckling and maximize the transfer of weight downhole. Subsequently a heavier, stiffer workstring was used which transferred more weight downhole (39,000-lbs vs. 54,000-lbs).…”
Section: °mentioning
confidence: 99%
“…2 The results of the real time data were compared to models and indicated that a stiffer workstring was desired to minimize buckling and maximize the transfer of weight downhole. Subsequently a heavier, stiffer workstring was used which transferred more weight downhole (39,000-lbs vs. 54,000-lbs).…”
Section: °mentioning
confidence: 99%