2012
DOI: 10.1007/978-1-4614-3558-7_70
|View full text |Cite
|
Sign up to set email alerts
|

Expert System Aided Power System Reinforcement with Reliability and Voltage Sag Consideration

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2015
2015
2017
2017

Publication Types

Select...
2
1

Relationship

1
2

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 4 publications
0
2
0
Order By: Relevance
“…Cost of interrupti can be assessed by the unavailability of this bu interruption of load connected to it. This is giv 1 and ∑ The method used in this paper for reliability introduced in [8] and [9] as a robust and suitable for ring and interconnected tr distribution power systems. The idea of th remove the least possible number of system c that it contains the source of supply and Reliability of each node is then calculated s subsystem actually becomes a radial system removed components are added one at a time node reliabilities are updated after each addit component is removed after system node r been updated for this addition.…”
Section: -Cost Of Interruptionmentioning
confidence: 99%
See 1 more Smart Citation
“…Cost of interrupti can be assessed by the unavailability of this bu interruption of load connected to it. This is giv 1 and ∑ The method used in this paper for reliability introduced in [8] and [9] as a robust and suitable for ring and interconnected tr distribution power systems. The idea of th remove the least possible number of system c that it contains the source of supply and Reliability of each node is then calculated s subsystem actually becomes a radial system removed components are added one at a time node reliabilities are updated after each addit component is removed after system node r been updated for this addition.…”
Section: -Cost Of Interruptionmentioning
confidence: 99%
“…When the planning engineer tries to improve one of these features he may be faced with one or more contradicting feature which will badly affected by this improvement. One of the contradicting problems presented in [8,9] is the conflict between reliability and voltage sag when it is aiming at reinforcing the distribution network through line additions. Fortunately, this conflict completely disappears when network reinforcement is done by adding DG unit.…”
Section: Introductionmentioning
confidence: 99%