2007
DOI: 10.1016/j.nucengdes.2006.04.027
|View full text |Cite
|
Sign up to set email alerts
|

Experimental evaluation of human–system interaction on alarm design

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
7
0
1

Year Published

2009
2009
2019
2019

Publication Types

Select...
4
1
1

Relationship

2
4

Authors

Journals

citations
Cited by 31 publications
(8 citation statements)
references
References 6 publications
0
7
0
1
Order By: Relevance
“…For instance, the three papers evaluating display design in the petrochemical industry (Adhitya et al, 2014;Jamieson, 2007;Laberge et al, 2014) all evaluated speed and accuracy but did not include performance-shaping measures that could explain those outcomes. In the nuclear industry domain, a few researchers have combined speed and accuracy measurement with workload ratings and SA measurement (e.g., Huang et al, 2007;Yang et al, 2012). Both of those research groups used the NASA-TLX for workload measurement, but their SA tools were not well defined in the publications.…”
Section: Discussionmentioning
confidence: 99%
See 2 more Smart Citations
“…For instance, the three papers evaluating display design in the petrochemical industry (Adhitya et al, 2014;Jamieson, 2007;Laberge et al, 2014) all evaluated speed and accuracy but did not include performance-shaping measures that could explain those outcomes. In the nuclear industry domain, a few researchers have combined speed and accuracy measurement with workload ratings and SA measurement (e.g., Huang et al, 2007;Yang et al, 2012). Both of those research groups used the NASA-TLX for workload measurement, but their SA tools were not well defined in the publications.…”
Section: Discussionmentioning
confidence: 99%
“…Workload is multi-dimensional, and subjective workload assessment can complement objective performance measurements by providing insight into how operators react to various work demands. Researchers have assessed subjective workload required with displays in nuclear power control rooms (e.g., Huang et al, 2007;Yang et al, 2012), demonstrating the potential application to other control room settings.…”
Section: Subjective Workloadmentioning
confidence: 99%
See 1 more Smart Citation
“…The PCTran is a software package released by Micro‐Simulation Technology (Montville, NJ) that can simulate a variety of accident and transient conditions for NPPs. The PCTran platform used in this study is a modified version of studies by Huang et al (2006; 2007). It is used to investigate the effects of the level of automation on human performance and subjective ratings.…”
Section: Methodsmentioning
confidence: 99%
“…Taking an inappropriate action might include the control room operator calling field operators to fix equipment that is in an unsafe state because the CPs have changed the equipment setting without operator awareness. For example, when a return-to-normal alarm is reset automatically by CPs, operators may not be aware that such an alarm had sounded, hindering the operator's comprehension and prediction of the plant state [17].…”
Section: Introductionmentioning
confidence: 99%