2016
DOI: 10.1016/j.renene.2016.07.065
|View full text |Cite
|
Sign up to set email alerts
|

Experimental and numerical characterization of a full-scale portable hydrokinetic turbine prototype for river applications

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
8
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 23 publications
(8 citation statements)
references
References 16 publications
0
8
0
Order By: Relevance
“…The connection cable to be selected for this system must have a current carrying capacity of at least 58 A. Equation (8) should be used to calculate the cable cross section. s = 0.0175 * 2 * l * P/ f k * U 2 (8) In Equation 8, s is cable cross-sectional area (mm 2 ), f k is conductor loss (%), l is cable length (m), P is power (W), U is system voltage (V) and a specific coefficient of 0.0175 for copper (Ω.mm 2 /m).…”
Section: Cost Analysis Resultsmentioning
confidence: 99%
See 1 more Smart Citation
“…The connection cable to be selected for this system must have a current carrying capacity of at least 58 A. Equation (8) should be used to calculate the cable cross section. s = 0.0175 * 2 * l * P/ f k * U 2 (8) In Equation 8, s is cable cross-sectional area (mm 2 ), f k is conductor loss (%), l is cable length (m), P is power (W), U is system voltage (V) and a specific coefficient of 0.0175 for copper (Ω.mm 2 /m).…”
Section: Cost Analysis Resultsmentioning
confidence: 99%
“…Hydrokinetic turbines have very similar design and theoretical background to wind and hydrodynamic conversions such that all of those systems offer clean energy with a low environmental effect [5,6]. Most of the recent studies were intend to increase the efficiency of hydrokinetic machines in terms of power coefficient and hydro dynamical properties by avoiding system losses [7,8].…”
Section: Introductionmentioning
confidence: 99%
“…In line with the increase in the electrification ratio target to 100% by 2025, the electricity demand is projected to increase more than 7 times to 1,611 TWh in 2050. To meet this electricity demand the government has made a 35 GW program which has been confirmed in the Medium Term Development Plan document National (RPJMN) 2015 to 2019 [1]. When this program was launched, there was a slowdown in achievement due to economic and technical factors, such as the characteristics of each type of power plant project.…”
Section: Introductionmentioning
confidence: 99%
“…Riglin et al analyzed the relationship between the output power changes in a propeller-based hydrokinetic turbine and the 2 of 14 system components, including the generator, transmission, gearbox, etc. [8]. Du et al designed a pump as turbine (PAT) control strategy for the water supply system and investigated the output power changing trend with operating time.…”
Section: Introductionmentioning
confidence: 99%