Examining barriers and measures to promote the adoption of green building practices in Pakistan

Abstract: Purpose The purpose of this paper is to investigate the barriers inhibiting the adoption of green building and measures to promote this approach in Pakistan. Design/methodology/approach Barriers and measures were identified and examined by using a combination of research methods, including literature review, questionnaire survey, and in-depth interviews with the construction industry-related practitioners working in Pakistan. Ranking technique and factor analysis were used to identify the significant issues … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

2
42
0
9

Year Published

2019
2019
2024
2024

Publication Types

Select...
7
2

Relationship

1
8

Authors

Journals

citations
Cited by 64 publications
(53 citation statements)
references
References 24 publications
2
42
0
9
Order By: Relevance
“…Owing to substantial energy usage by buildings, they present a potential research area to investigate ways of reducing their energy footprint. The concept of green and energy-efficient buildings is in its infancy in Pakistan [15] and there are very few such projects like FFC Sona Towers in Rawalpindi, MCB Centre in Lahore and Centre Point Tower in Karachi that can be termed as nearly green or energy-efficient buildings. These have been selected for a thorough investigation in the current study.Despite the development of energy-efficient buildings locally or anywhere else, their reported energy savings are far from design expectations and there is a gap between the predicted and the actual energy use [16][17][18].…”
mentioning
confidence: 99%
“…Owing to substantial energy usage by buildings, they present a potential research area to investigate ways of reducing their energy footprint. The concept of green and energy-efficient buildings is in its infancy in Pakistan [15] and there are very few such projects like FFC Sona Towers in Rawalpindi, MCB Centre in Lahore and Centre Point Tower in Karachi that can be termed as nearly green or energy-efficient buildings. These have been selected for a thorough investigation in the current study.Despite the development of energy-efficient buildings locally or anywhere else, their reported energy savings are far from design expectations and there is a gap between the predicted and the actual energy use [16][17][18].…”
mentioning
confidence: 99%
“…Based on case study data in previous research, it was clear that green building investment was relatively unattractive to investors because of a high premium cost of green building implementation and uncertainty of the performance of the green building features. These features accelerated the payback period of investment because of lack of knowledge, and the most interesting element was the absence of external incentives in providing encouragement for and guarantee of new technological applications (Liu et al, 2014;Pikas et al, 2015;Azeem et al, 2017;Preciado-Pérez & Fotios, 2017). Therefore, CBA development in this research did not only result from the relationship between integrating green building aspects with the CBA and life cycle costs but also the green building incentive system.…”
Section: Advanced Cba Frameworkmentioning
confidence: 96%
“…Além disso, o mesmo percentual de respondentes afirma que o tempo na fase de projeto é insuficiente para adquirir conhecimento sobre como aplicar e detalhar esses materiais. Akadiri (2015), Azeem et al (2017), Ghazilla et al (2015) e Maté (2009) justificam que a maioria dos profissionais de interiores, inclusive os que se veem proativos, demostram pouca confiança em seus próprios conhecimentos.…”
Section: Variávelunclassified
“…A falta de confiança em seus conhecimentos nessa área, tanto no presente estudo como nos trabalhos de Akadiri (2015), Azeem et al (2017), Ghazilla et al (2015) e Maté (2009) foi apontada como um dos pontoschave que justificou a sua não utilização. Agora, pela análise de associação entre as variáveis, percebe-se que quanto maior a autoavaliação do respondente em relação a sua familiaridade com MAP maior também foi a aplicação dos mesmos em seus projetos.…”
Section: Análise Da Relação Entre Variáveis Do Questionário -Escala Lunclassified