2018
DOI: 10.1049/joe.2018.0260
|View full text |Cite
|
Sign up to set email alerts
|

Evaluation of the limitations of a permissive overreach protection scheme in a distribution loop in case of cross country faults and proposal of alternative solutions

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 3 publications
(13 reference statements)
0
2
0
Order By: Relevance
“…The optimal allocation of DGs with practical load models using optimization techniques based on novel multi-objective function is studied to enhance the system performance parameters (Bohre et al, 2016). The permissive overreach protection for clearance of fault rapidly in MV distribution including signal comparison schemes by performing short circuit calculations and electromagnetic transient using DIgSILENT PowerFactory is proposed (Borgnino,et al, 2018). The PV-Wind based renewable DGs planned in distribution systems using grasshopper optimization with operating time of overcurrent relay (Belbachir et al, 2021).…”
Section: Introductionmentioning
confidence: 99%
“…The optimal allocation of DGs with practical load models using optimization techniques based on novel multi-objective function is studied to enhance the system performance parameters (Bohre et al, 2016). The permissive overreach protection for clearance of fault rapidly in MV distribution including signal comparison schemes by performing short circuit calculations and electromagnetic transient using DIgSILENT PowerFactory is proposed (Borgnino,et al, 2018). The PV-Wind based renewable DGs planned in distribution systems using grasshopper optimization with operating time of overcurrent relay (Belbachir et al, 2021).…”
Section: Introductionmentioning
confidence: 99%
“…A simplified network has been tested considering limited cases of analysis. In [11,13] time-domain simulation is performed to highlight the analysed problems evidenced in [12]. However, polarisation methods have not been explored extensively enough.…”
Section: Introductionmentioning
confidence: 99%