Evaluation of Power Generation Efficiency of Cascade Hydropower Plants: A Case Study

Abstract: Effective utilization of scarce water resources has presented a significant challenge to respond to the needs created by rapid economic growth in China. In this study, the efficiency of the joint operation of the Three Gorges and Gezhouba cascade hydropower plants in terms of power generation was evaluated on the basis of a precise simulation-optimization technique. The joint operation conditions of the Three Gorges and Gezhouba hydropower plants between 2004 and 2010 were utilized in this research in order to… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
3
0
1

Year Published

2014
2014
2024
2024

Publication Types

Select...
7
2
1

Relationship

0
10

Authors

Journals

citations
Cited by 11 publications
(5 citation statements)
references
References 12 publications
0
3
0
1
Order By: Relevance
“…To solve the optimal control problem that will maximise the energy generation in the two stations, the problem must be properly posed in a standard form (Robert & Michaud, 2011;Zheng, Fu, & Wei, 2013).…”
Section: Operational Characteristics Of the Kheps And Jhepsmentioning
confidence: 99%
“…To solve the optimal control problem that will maximise the energy generation in the two stations, the problem must be properly posed in a standard form (Robert & Michaud, 2011;Zheng, Fu, & Wei, 2013).…”
Section: Operational Characteristics Of the Kheps And Jhepsmentioning
confidence: 99%
“…Though this typically leads to short-term profit setbacks (Hernández et al 2011;Zheng et al 2013) it also contributes to long-term profitability by avoiding damage to the HP infrastructure. Moreover, it may have a positive effect on the public acceptance of HP plants that provide these services so far without any payment.…”
Section: Short-term Challengesmentioning
confidence: 99%
“…Fan [3], Rasekh [4], Afshar [5], Xue [6] et al, in allusion to the river diversion of the independent hydropower station, employed different methods to evaluate the risk of the diversion system and link the development of the diversion standard with system risk. Lu [7], Huang [8], and Zheng [9] aimed at the operation of cascade hydropower station, studied the mutual effect in hydrological regime, sedimentation, fish assemblage, power generation. On this basis, some scholars proposed optimizing the river diversion through flow-control of upstream reservoir.…”
Section: Introductionmentioning
confidence: 99%