2017
DOI: 10.33536/jg.v5i3.145
|View full text |Cite
|
Sign up to set email alerts
|

Estimasi Sumberdaya Pembangkit Listrik Tenaga Mikrohidro (Pltmh) Dalam Pemenuhan Kebutuhan Listrik Dusun Pulau Timun, Kabupaten Lahat, Provinsi Sumatera Selatan

Abstract: Perhitungan dilakukan untuk menganalisis potensi energi air hingga estimasi energi daya yang dihasilkan. PLTMH Pulau Timun mengoptimalkan debit aliran 2,55 m 3 /s dari lebar Sungai Air Mannaijau yang mencapai 7,5 m serta kedalamn sungai rata-rata 0,38 m. Berdasarkan data pengukuran hidrografi dan topografi tersebut, maka Sungai Air Mannaijau diestimasikan mampu mewujudkan potensi daya total pembangkit listrik sebesar 87,46 kW.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
4
0

Year Published

2021
2021
2022
2022

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(4 citation statements)
references
References 0 publications
0
4
0
Order By: Relevance
“…Almost the rivers in OKU Selatan are possible for hydropower because most of the landscape shows the topography of hills and mountains, which are flowed by many young permanent rivers, flow relatively fast-flowing water a reasonably large stream gradient. The permanent river has the potential for hydroelectric power, where the water discharge will be relatively maintained even though the dry season [7]. The distance from main river criteria divided into three classes, including low indicates more than 1500 M distance from the main river, medium suggests more than 1000 M from the main river, and high mean less than 500 M distance from the main river.…”
Section: Distance From Main Rivermentioning
confidence: 99%
See 2 more Smart Citations
“…Almost the rivers in OKU Selatan are possible for hydropower because most of the landscape shows the topography of hills and mountains, which are flowed by many young permanent rivers, flow relatively fast-flowing water a reasonably large stream gradient. The permanent river has the potential for hydroelectric power, where the water discharge will be relatively maintained even though the dry season [7]. The distance from main river criteria divided into three classes, including low indicates more than 1500 M distance from the main river, medium suggests more than 1000 M from the main river, and high mean less than 500 M distance from the main river.…”
Section: Distance From Main Rivermentioning
confidence: 99%
“…1025 obstacle for the State Electricity Company (PLN) in distributing electricity for that area [7]. Currently, the limited people in un-electrified villages not supplied by PLN use traditional turbines to meet the electricity needs.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Block modeling techniques are widely applied in the modeling and calculation methods of mineral resources in the mining industry. This technique has generally been done computerized (Anshariah, 2016;Ramadhan et al, 2022;Thayib et al, 2017). The distribution of resources/reserves in these blocks is able to make it easier for us to do quality assessments so that a quality distribution can be produced with location details (coordinates) and block unit volumes that are adjusted to the mining dimensions (Afriandi, 2015;Mustika, 2016).…”
Section: Introductionmentioning
confidence: 99%